HIGH-LEVEL SUMMARY

Wollam Construction built a rail loadout facility where the owner will convert their Crude Unit to a Renewable Diesel Unit. The Project allowed the facility to receive feedstock products by rail, store the products, process the products, store the renewable diesel, and load the renewable diesel onto rail which will then be transported to destination markets.

Wollam performed the sitework, underground utilities, site grading, excavation, rail line preparation, concrete, and structural steel.

The project was completed on schedule with no safety incidents.