IRRIGATION & INTERSECTION AMENDMENTS

Irrigation and roadway upgrades and corrections in one weekend.

date
June 2020
location
Hooper, Utah
client
Utah Department of Transportation

PROJECT OVERVIEW

project brief

The intent of the project was to improve the intersection on an existing two lane 55 MPH road that crossed over an existing irrigation canal. UDOT allowed a onetime weekend closure of the roadway from 6:00 PM Friday to 5:00 AM Monday. During the closure Wollam demolished the existing concrete box culvert, installed an 8″ waterline loop under new concrete box culvert, installed new 112’ wide precast concrete box culvert, installed waterproof membrane on new box culvert, backfilled and temporary paved over the top to open back up the road to the public.

Following the closure, we began work on the widening of the existing roadway to account for the new turn pockets. This had to be worked in phases to ensure that two lanes of traffic could be maintained throughout the project. This scope included the relocation of fire hydrants, installation of 900 linear feet of 12″ and 18″ RCP pipe, place and compact granular borrow and road base, and the laying of a 6″ mat of asphalt. After the widening phases were completed, the roadway was chip sealed and final painted striping was installed.

deliverables
  • Heavy Civil
  • Underground Utilities
  • Pre-Cast Concrete Installation
  • Concrete

Take the next step

Interested in working with Wollam Construction? Let us help you get started on your project. Contact us to find out more information or to request a bid.